The first major phase of renovations at the Hotel Bellevue-Terminus, which first opened in 1898, was completed between May and November 2011. The south wing with previously 57 rooms was completely gutted and has been replaced with a contemporary interior. The building services and all the safety requirements are now once again state-of-the-art. The acoustics have also been taken into account with a five- layer floor structure, and the thermal insulation boosted with triple-glazed windows. But it’s not just the interior design that’s a talking point – the look of the rooms is just a s eye-catching. In the Hotel ’s new rooms the Belle Epoque style has been combined with modern elements and in some cases entirely re-interpreted
Hotel Bellevue Terminus
The first major phase of renovations at the Hotel Bellevue-Terminus, which first opened in 1898, was completed between May and November 2011. The south wing with previously 57 rooms was completely gutted and has been replaced with a contemporary interior. The building services and all the safety requirements are now once again state-of-the-art. The acoustics have also been taken into account with a five- layer floor structure, and the thermal insulation boosted with triple-glazed windows. But it’s not just the interior design that’s a talking point – the look of the rooms is just a s eye-catching. In the Hotel ’s new rooms the Belle Epoque style has been combined with modern elements and in some cases entirely re-interpreted